Skip to content
WhatsApp

TRUST · CORRECTIONS

Corrections ledger

Every factual correction to this site, newest first — what we said, what the record says, the source, and the pages that changed.

ENTRY 1 · 30 SEP 2026

Collector-rate vintage: the 2026 final documents exist

What we said

That the 2025 collector-rate tables were the ruling vintage for Palwal district and that FY 2026-27 rates were not published. We had checked the state rate viewer on 17 July 2026, and its period list then ended at 2025. One FAQ answer said the opposite — that FY 2026-27 rates had been in force since 1 April 2026 — without a source.

What the record says

The district's listing on palwal.gov.in, titled "Collectrate Rate FY 2026", links a signed "Final Collector Rates for 2026" document for each of the five registration desks: Palwal, Hodal, Hathin, Hassanpur and Bahin. Each is printed with a system date of 1 April 2026 and signed by the district's revenue officers. None of them states an effective date, so we state none. Nuh district's own documents, "Collector Rate FY 2026", were posted on nuh.gov.in on 21 April 2026.

A second defect surfaced with it: our rows for the Hodal, Hathin, Hassanpur and Bahin registration desks had come from 2025 predictive/committee documents, not signed finals. Those rows are replaced by rows read from the 2026 finals.

What changed

Every rate figure now on the site was read from the signed scans twice — once from the full page, once from an independent high-resolution crop — and is published only where both reads matched. Where a village's row has not been read that way, the page names the document instead of quoting a figure. The pages that changed:

How we keep it right

District offices notify a new list each year — check palwal.gov.in (or nuh.gov.in for Nuh district) for a list newer than the one this site cites. When a newer list appears, the pages move to it and an entry goes up here.

Sources

  1. Final Collector Rates for 2026 — Tehsil Palwal — signed; system date 1 Apr 2026
  2. Final Collector Rates for 2026 — Tehsil Hodal — signed; system date 1 Apr 2026
  3. Final Collector Rates for 2026 — Tehsil Hathin — signed; system date 1 Apr 2026
  4. Final Collector Rates for 2026 — Tehsil Hassanpur — signed; system date 1 Apr 2026
  5. Final Collector Rates for 2026 — Tehsil Bahin — signed; system date 1 Apr 2026
  6. District listing — "Collectrate Rate FY 2026" — palwal.gov.in
  7. Nuh district listing — "Collector Rate FY 2026" (per tehsil) — nuh.gov.in, 21 Apr 2026

Last verified: 30 Sep 2026

BEFORE THIS LEDGER

Earlier verification corrections

Corrections made to our own working brief during the July 2026 build, recorded in the master plan's verification section before this public ledger opened. Each topic's page carries the corrected fact with its source and date.

Earlier verification corrections, July 2026
No.What was correctedVerified
1Jewar (Noida International) Airport — opening status17 Jul 2026
2Delhi–Mumbai Expressway through Palwal — interchange claims17 Jul 2026
3Panchgram — announced, not notified17 Jul 2026
4Golden Ring / CNCR (RP-2041) — board-cleared, unnotified17 Jul 2026
5Highway numbering — NH-44 (old NH-2), not NH-1917 Jul 2026
6District structure — five registration desks17 Jul 2026
7Hathin coordinates17 Jul 2026
8Nuh New City e-Bhoomi window17 Jul 2026
9e-Bhoomi windows never conflated17 Jul 2026
10Palwal development plan — "Palwal 2031" does not exist17 Jul 2026
11Collector-rate vintage — superseded by entry 1 above17 Jul 2026
12"IMT Greater Faridabad" is not an official project name17 Jul 2026
13NH-44, not NH-19, through Mathura district18 Jul 2026
14YEIDA transfer and ceiling mechanics18 Jul 2026
Entry 11 is the statement that entry 1 corrects.

Seen something wrong? Send the page and the source through contact. If the record agrees, the page is fixed and a dated entry goes up here.